Customization: | Available |
---|---|
Material: | Steel Structure |
Usage: | Dormitories, Warehouse, Villa, Temporary Offices, Workshop, Living House, Prefab Home, Modular Home |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
prefabricated steel villa Material specification |
||
1 |
prefabricated steel villa Roof |
Colored-asphalt shingle, 0.5mm color-bond steel roofing, 75mm PU sandwich roofing sheet |
2 |
Floor |
10mm Anti-slip ceramic, 15mm bamboo flooring, 18mm solid wood flooring |
3 |
Window |
AS standard aluminum double glass window |
4 |
External door |
AS standard aluminum double glass sliding door& bi-folding door |
5 |
Internal door |
Solid wood door surface with white paint |
6 |
External wall |
75mm AAC panel, 15mm pattern fiber-cement cladding |
7 |
Internal wall |
12mm gypsum board with emusion paint |
8 |
Ceiling |
10mm Gypsum board with emusion paint |
9 |
Sanitary |
Water-marked certificated |
10 |
Kitchen |
MDF cabinet surface with lacquered paint and bench top with quartz stone |
11 |
Electrical fittings |
As standard wiring, power point, switch, light, circuit-breaker |
12 |
Gutter |
PVC gutter with down pipe& Aluminum gutter with down pipe |
1. 24 hours on line &one to one service, solve your problem efficiently.
2. Professional installation team and site engineers for foreign countries.
3.Customers are warm welcomed to visit our factory at any time, even during holidays.
4.Perfect arrangement for customers from Hotel booking to product shipping.
1. Q: Are you a factory or trading company?
A:Guangzhou Moneybox Steel Structure Engineering Co., Ltd. is a factory located in Panyu district, Guangzhou, Guangdong province.
2.Q: What's your supply capacity?
A:Annual Production: container house 72000sets,prefab house 564000square meters;portable toilet 24000sets;steel structure 360000square meters .
3. Q:How to install ?
A:We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation,wages will be provided by buyers.
4. Q: How long is your delivery time?
A:Generally it is within 2-30 days ,definitely according to quantity and color.
5. Q: How do you guarantee the quality of the products?
A:Strict product quality control, quality makes the future.This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before delivery.
6. Q: How can I get the quotation of the project ?
A:If you have drawing ,we can offer you our quotation according to your drawing .
If you have no design , Our engineer will design some drawings for you to confirm. And then offer you a quotation.