Customization: | Available |
---|---|
Windows: | PVC Sliding Window |
Doors: | Security Door/Sandwich Panel Door |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cheap Prefab Houses | |||
No. | Component | Description | Thickness |
1 | Main Steel Structure | 8#C Steel, Square Tube, Angle Iron, Flat Tube, Round Tube | 2.0mm |
2 | Roof Tile | PU or EPS Tile | 20-150mm |
3 | External Wall Panel | 50-250mm EPS, PU, Rockwool or EPS Cement with Two-sides Color Steel Sandwich Panel | 0.326mm for Color Steel Sheet |
4 | Door | Color Steel Sandwich Panel Door | 870mm(W) × 2100mm(H) |
5 | Window | PVC Sliding Window | 1200mm(W) X 1000mm(H) 1748mm(W) × 925mm(H) |
6 | Flooring | Plywood or PVC | 15/20mm |
7 | Celling | PVC or Gypsum Board | 8-12mm |
Technical Paremeter | |||
No. | Description | Specification | |
1 | Bearing Load | 150kg/square meters | |
2 | Wind Pressure | 0.45KN/square meters Equal 10 Grade | |
3 | Earthquake Resistance | 8 Grade | |
4 | Temperature Resistance | (-45°C) to 50 °C | |
5 | Life Span | More Than 10 years |
Characteristics:
1. Environmentally friendly, no waste produced during assemble.
2. Flexibility when fixing doors, windows and interior partitions.
3. Beautiful appearance, different colors for the walls and roof.
4. Cost saving and convenient to transport.
5. Safe and stable, can withstand A Grade 10 earthquake
1.24 hours on line &one to one service, solve your problem efficiently.
2. Professional installation team and site engineers for foreign countries.
3. Customers are warm welcomed to visit our factory at any time, even during holidays.
4. Perfect arrangement for customers from Hotel booking to product shipping.
1. Q: Are you a factory or trading company?
A: Guangzhou Moneybox Steel Structure Engineering Co., Ltd. is a factory located in Panyu district, Guangzhou, Guangdong province.
2. Q: What's your supply capacity?
A: Annual Production: Container house 72000sets, prefab house 564000square meters; Portable toilet 24000sets; Steel structure 360000square meters.
3. Q: How to install?
A: We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.
4. Q: How long is your delivery time?
A: Generally it is within 2-30 days, definitely according to quantity and color.
5. Q: How do you guarantee the quality of the products?
A: Strict product quality control, quality makes the future. This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before delivery.
6. Q: How can I get the quotation of the project?
A: If you have drawing, we can offer you our quotation according to your drawing.
If you have no design, Our engineer will design some drawings for you to confirm. And then offer you a quotation.